West Palm Beach, FL
Manhattan Construction – Black Hawk Joint Venture
Adroit was asked to design and install a 210kW Photovoltaic electric solar system for the Army Reserve Base in West Palm Beach, FL. Adroit partnered with Manhattan Energy on this project.
Completed 2013